Vault Progress 2

Update for the vault –

corridor complete.JPGThe main corridor has been fully textured.

Power box textured.JPGHere is the power box textured.

Creating stairs.JPGBanisters.JPGI also modelled the stairs outside the entrance of the vault, along with the support banisters.

Banister support.JPG

Banister posts.JPGBanister progress.JPG

wooden wall test render .jpgI also put a wood texture on the office wall.

wooden office door.JPGHere is the office door textured. One thing missing which I still need to put on, is the word “PRIVATE” which goes onto the glass.

Top down screenshot.JPGHere is a top down screenshot of the current process.

Corridor shot 5.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s